09.12.10: APCS design for 4.5 mln. rubles

A Reliable APCS rev1 service package on development of the APCS detail and design documentation for the petrol, chemical, and gas industries for 4 500 000 RUB, VAT incl.
Top Level Systems LLC offers a Reliable APCS rev1 service package on APCS detail and design documentation development for the petrol, chemical, and gas industries for 4 500 000 RUB, VAT incl.

Automation target is a complex explosion and flammable hazardous facility, up to 1000 i/o. As basic equipment we use hardware and software packages from Yokogawa, Siemens, Honeywell.

Advantages of purchase of the Reliable APCS rev1 service package from Top Level Systems LLC:

as a buyer of the Reliable APCS rev1 service package you immediately know the APCS costs, what enables you to carry out planning and project management of construction more efficiently.
applicable technical and design solutions for the Reliable APCS rev1 service package meet the safety norms of the Russian Federation and will not bring up additional questions from governmental bodies of the Russian Federation.
trouble-proof hardware and redundant equipment used in the Reliable APCS rev1 service package enables you to operate a technological facility trouble-free with the specified productivity.
high-quality design documentation in the Reliable APCS rev1 service package will enable you to implement construction-and-assembling operations quickly and of high quality with minimal overruns of materials and labor costs.

Rendering of the Reliable APCS rev1 service package from Top Level Systems LLC Implies the following:
project management is implemented by AFW Wirtschaftsakademie Harzburg Project Management credential holders.
project planning and project management are fulfilled with the use of Project Management System composed of Project Management, Project Portfolio Management and Collaboration software from Advanta-Group.
the work is performed by the specialists with over 7 years of professional experience in design engineering, commissioning and running of the Automatic Control Systems at complex production facilities for the petrol, chemical and gas industries.
standardized engineering and project design solutions act by design engineering as a basis enabling to speed up time on producing documents by up to 100 per cent.
partnership relations between our Company and worldwide leading manufacturers enable us to mutually cooperate on a timely basis by performance of work.

Deadline for rendering of the Reliable APCS rev1 service package from Top Level Systems LLC:
If basic engineering design data is available:
design documentation 1.5 months.
detail documentation 2.5 months.

Standard Reliable APCS rev1 service package from Top Level Systems LLC includes the following works:
1.Top-level APCS technical design assignment under State Standard (GOST) Nr. 34.602-89.
2.During the design documentation stage documents are developed within the scope prescribed by the Russian Federation Government Ordinance of February 16, 2008 under Nr. 87 Design documentation section composition and requirements to its content.
3.During the detail documentation stage the following documents under State Standard (GOST) 34.201-89 are developed:

System-wide documentation:
explanatory note;
general system description;
automated function description;
design and detail documentation sheet;
programme and methods of testing;
design certificate;
technical passport.

Information support documentation:
input data list;
output data list;
system information support technology description;
human interface description.

Mathematical support documentation:
algorithm description;
logical diagrams album;

Hardware documentation:
hardware description;
hardware block diagram;
wiring diagram;
wiring and connection table;
equipment and wiring layout;
equipment specification;
hardware installation diagram;
electric schematic diagram;
cable schedule.
Requirements to the document content developed during system implementation are set by RD (ruling document) Procedural Guidelines, IT Nr. 50-34.698-90 Automated Systems. Requirements to the document content.

4.Assignments on construction activities, heating, ventilation and air-conditioning, electric power supply to cooperating companies.
5.The project provides for a technical record-keeping of material flows and fuel and utilities.

Should you require full information please address to the head office:

45 a Gvardeyskaya, office 206,
420073 Kazan,
Russian Federation
tel/fax +7 843 295 79 77
email: sale@tl-sys.ru






News

25.01.12 Another major object added to TLS LLC's reference list

"Top Level Systems" LLC has developed working documentation for measuring equipment and PCS of anti-surge and station control for compressors 340-81-5 (Gazprom-ONPZ public corporation).

15.05.11 Top Level Systems Company is implementing a contract for the Troitsk gas booster station

Our company is awarded to produce high voltage and low voltage power supply detailed design for the Troitsk gas booster station. Scheduled completion date is July 2011.

09.12.10 APCS design for 4.5 mln. rubles

A Reliable APCS rev1 service package on development of the APCS detail and design documentation for the petrol, chemical, and gas industries for 4 500 000 RUB, VAT incl.

01.11.10 Top Level Systems LLC completes development of the design documentation stage for the associated gas processing plant in the Chechen Republic.

Over 1000 points of monitoring and control, over 12 compressor units, LPG and highly flammable liquid storage facilities, loading/unloading racks, gas separation units. Our company implements works on instrumentation and controls, process automated control system, high voltage and low voltage power supply.

05.05.10 Commencement of the design documentation and detail documentation development for the associated gas processing plant in the Chechen Republic.

Design works include the following sections:
-APCS
-C&I
-high voltage power supply
-low voltage power supply.

19.04.10 Top Level Systems LLC obtains a certificate of a self-regulating company for design works

On 16 April, 2010 a non-commercial partnership Kazan design engineer association issued a competency certificate on the front end engineering design works exerting influence on capital project safety under Nr. SRO-P-149-1660121412-01-019.

29.12.09 A training simulator for APCS process operators.

A computer training simulator for process operators makes it possible to train operators to work at a definite unit by means of APCS system.

05.11.09 Top Level Systems LLC has completed design works for the Volgian water intake facility.

In the shortest possible time, with only three days, the TLS LLC specialists implemented an electric motor protection setting value calculation for the project facility 2nd elevation pumping plant upgrade within the territory of the Volgian water intake facility.

15.06.09 Top Level Systems LLC management is gaining education in an MBA program.

TLS LLC Business Development Director is currently effectively earning his Master's in Business Administration (MBA) degree. It helps the company face the future with confidence and flexibly address the needs of our customers.

21.04.09 Top Level Systems LLC has carried out development of an automated control system detailed design for the gas compressor station

The system is developed on technological tools from Allen Bradley, redundant controllers from Control Logix. GE Fanuc iFIX is applied as Supervisory Control and Data Acquisition (SCADA) software. The information system power is over 1000 i/o of monitoring and control.

420073, Russia, Kazan, Gvardieskaya st. 45a
tel./fax: (843) 295-79-77
e-mail: sale@tl-sys.ru